India Opportunities - Project Reporter - India's Project Database
Result(s) found: 19671967
New railway route laid from Tuticorin to Madurai
20 Dec 2017
New railway route is being laid from Tuticorin to Madurai covering 143.5 km in three sections. Around 24 acre of land is acquired from private land owners and handed over to the Madurai Division of Southern Railways by the Tuticorin District....
Ambala division looks forward to complete pending projects
20 Dec 2017
Ambala division aims to complete the pending projects announced in the last four years. Some of the major projects included disabled-friendly world class Chandigarh railway station, green station, Chandigarh-Baddi rail link line, semi-high speed train between Chandigarh and Delhi, and training centre to impart railway related skills....
Dedicated Metro corridor between Mumbai and Navi Mumbai airports
20 Dec 2017
Proposal is being considered to provide high-speed rail connectivity between the existing Chatrapati Shivaji International Airport in Santacruz to the proposed Navi Mumbai International airport. The detailed project report (DPR) of the high-speed corridor is being prepared....
100% electrification of Broad Gauge (BG) rail routes
19 Dec 2017
Indian Railways is targeting 100% electrification of its Broad Gauge (BG) rail routes. The railways have prepared an Action Plan to electrify 38000 Route Kilometers in five years (2017-18 to 2021-22). To achieve 100% electrification of BG rail routes, on an average 4000 Route km/annum will be electrified in place of 1700 route km/annum, which will further be increased to 6000 Route Kilometers in 2018-19....
Development of waterways
19 Dec 2017
A total of 111 waterways have been declared as National Waterways under the National Waterways Act, 2016. Out of these 111 NWs, NWs-1, 2 and 3 are operational with cargo and passenger vessels are moving on them. Development works under Phase-I have commenced on NW-4 in 2017....
Railways to install European Train Control System costing Rs 12,000 crore
19 Dec 2017
The Railway Board has recently cleared the proposal to equip 6,000 electric locos with European Train Control System (ETCS) Level-II. This would help prevent rail mishaps. The project is expected to cost Rs 12,000-crore. ETCS Level-II system will be installed on the entire 9,054 km-long Golden Quadrilateral route connecting the four metros to make it a fully accident-free corridor....
Ambala Cantonment station to get 100+ HD CCTV cameras
19 Dec 2017
Ambala Cantonment's railway station is of the busiest and top revenue generating railway stations in the region. More than 100 High Definition CCTV Cameras is likely to be installed soon. The proposal has been completed and sent to the railway headquarters. The project is expected to commence soon....
International Training Centre for Operational Oceanography in Hyderabad
18 Dec 2017
The Union Cabinet has recently approved the establishment of International Training Centre for Operational Oceanography, as a Category-2 Centre (C2C) of UNESCO, in Hyderabad....
Financial restructuring of Konkan Railway
18 Dec 2017
The Cabinet Committee on Economic Affairs has recently approved the Second Financial Restructuring proposal of Konkan Railway Corporation Ltd (KRCL), a CPSE under the administrative control of the Ministry of Railways (MoR)....
60 MW Tuirial Hydroelectric Power Project
18 Dec 2017
60 MW Tuirial Hydroelectric Power Project was recently inaugurated in Mizoram. It is the first large hydropower project in the state of Mizoram. The huge reservoir is spread over an area of 45 sq km....
Previous 11 12 13 14 15 16 17 18 19 20  Next 

Advertise Here [728 W x 90 H pixels]