India Opportunities - Project Reporter - India's Project Database
Result(s) found: 21162116
Cochin airport update
18 Jan 2018
Cochin airport is coming up with a new maintenance hanger apart from the new terminal. The number of airport passengers is on the rise. It was 13 million in 2011-12 and likely to touch 30 million mark in 2021-22....
Aluminium car body train sets manufacturing at ICF
16 Jan 2018
Integral Coach Factory plans to undertake design development manufacturing testing and commissioning of Aluminium car body train sets at ICF. The project is estimated to cost Rs 2750 crore. Bids are currently invited....
Extension of MMTS Phase-II (Tripling) from Ghatkesar
16 Jan 2018
Rail Vikas Nigam Ltd plans to undertake the construction of Roadbed, Major and Minor Bridges and Track Linking (Excluding Supply of Rails and Sleepers,thick Web Switches and Special Sleepers) S&t and Ohe & General Electrical Work in Connection With Extension of MMTS Phase-II (Tripling) from Ghatkesar (Km. 213.840) to Raigir (Yadadri)(Km.246.230) on Secunderabad – Kazipet Section of Secunderabad Division of South Central Railway, Telangana State, India (33 Kms)....
New single line broad gauge rail link between Rishikesh And Karanprayag
16 Jan 2018
Rail Vikas Nigam Ltd plans to appoint Project Management Consultancy for detailed design and PMC for construction of Tunnels, Bridges, and formation works from Chainage 63 460 To 73 018 (9.558Km) under Package-5 In connection with new single line broad gauge rail link between Rishikesh And Karanprayag (125 Km) Uttarakhand. Bids are currently invited....
Effluent treatment plant at Chiria
16 Jan 2018
Steel Authority of India Ltd plans to assign the construction of Vehicle Washing facility and Effluent Treatment Plant (ETP) at Workshop,Manoharpur Ore Mines, Chiria. Bids are currently invited in this regard....
Independent Engineer for Navi Mumbai airport project
16 Jan 2018
Cidco, the nodal airport development authority for Navi Mumbai International Airport (NMIAL) is likely to float tenders for appointing Independent Engineer (IE) for the project. IE has to ensure the quality of the work and the timely completion of the project....
Pune Airport revamp
16 Jan 2018
Pune Airport revamp is on with a host of new facilities such as enhanced parking services, restaurant and smoking zone. As part of the plan, three new passenger boarding bridges are constructed and likely to complete by the end of June. The seating capacity is likely to be spruced up to 1500 from the current 650....
Jewar airport project
16 Jan 2018
Yamuna Expressway Industrial Development Authority (YEIDA) is the nodal airport development authority for Jewar airport in the state of Uttar Pradesh....
New terminal buildings coming up at five locations
16 Jan 2018
India is one of the fastest growing aviation markets in the world. During April-October 2017 period, total number of passengers handled rose to 171 million compared to 149 million in the previous year....
250 MW TPP commissioned in Bihar
12 Jan 2018
Bharat Heavy Electricals Ltd (BHEL) has successfully commissioned a 250 MW thermal power unit in Bihar. The unit has been commissioned at Barauni Extension thermal power project of Bihar State Power Generation Company Ltd....
Previous 21 22 23 24 25 26 27 28 29 30  Next 

Advertise Here [728 W x 90 H pixels]