India Opportunities - Project Reporter - India's Project Database
Result(s) found: 19321932
Consultancy services sought for Bhubaneswar – Ichhapuram road section
07 Sep 2017
National Highways Authority of India is seeking Consultancy services for i) Bhubaneswar (km 435.498) –Ichhapuram (km 620.430) section of NH-16 in the state of Odisha and ii) Chandikhole (Km.0.000) – Paradip (Km.77.000) section of NH-5A in the state of Odisha....
Six-laning of Kozhikode Bypass
07 Sep 2017
National Highways Authority of India plans to undertake six-laning of Kozhikode Bypass (Calicut Bypass) (i.e. Vengalam Jn. to Ramanattukara Jn.) section of NH-17 (new NH-66) from design chainage km 230+400 to design chainage km 258.800 in the State of Kerala under NHDP Phase III on Hybrid Annuity mode....
BMRCL to commence work on Dairy Circle - Nagawara section work in a year
06 Sep 2017
BMRCL is executing 72 km Namma Metro Phase II project which includes six lines, out of which four are extensions of Phase I project. The corporation is likely to commence Civil work on Metro underground section - from Dairy Circle to Nagawara covering 13.79 km in a year's time....
4-Lane Bridge over River Ganga
06 Sep 2017
NHAI plans to undertake construction of New 4-Lane Bridge (2 x 12.5m wide twin two lane structures) over River Ganga at downstream of Farakka Barrage including approaches connecting Farakka-Raiganj section of NH-34 from Km 290.940 (Design Chainage 0.000 km) to Km 296.805 (Design Chainage 5.468 km) in the State of West Bengal on EPC mode. Bids are currently invited upto 11th September, 2017....
Safety Consultants for 8-laning of section of NH-1
06 Sep 2017
NHAI seek appointment of Safety Consultants for 8-laning of section of NH-1 (New NH-44) from Mukarba Chowk at Km 15.500 to Panipat Km 86.000 on BOT (Toll) basis in the State of Haryana. Bids are currently invited upto 11th September, 2017....
Moschip sets up PCB unit in Uppal
05 Sep 2017
Hyderabad based MosChip has recently set up an assembly unit for PCBs in Uppal. The investment involved was to the tune of Rs 13 crore. with an investment of $1.5 million (Rs 13 crore)....
Karnataka Cabinet approves land acquisition cost escalation for Namma Metro Phase-II
05 Sep 2017
Karnataka state Cabinet recently approved a cost escalation of Rs 2,000 crore for land acquisition for 72-km long Bangalore Metro Rail Project Phase II....
Rs 162.60-crore water supply scheme for Mangaluru
05 Sep 2017
Mangaluru City Corporation council plans a Rs 162.60-crore water supply scheme named 'Jalshri' for the city of Mangaluru....
MoEF waives forest nod for army infra projects near LAC
05 Sep 2017
Defence infrastructure projects need not wait for forest nod from the Union Environment Ministry for projects up to a distance of 100 km from the China border (LAC)....
ABB to supply solar inverters for NR stations
04 Sep 2017
ABB India bags order to provide solar inverters to 750 railway stations in northern India. This would reduce dependence on traditional sources of energy. The solar inverters capacity would vary between 5kW to 50kW in performance depending on the size of the station....
Previous 31 32 33 34 35 36 37 38 39 40  Next 

Advertise Here [728 W x 90 H pixels]