India Opportunities - Project Reporter - India's Project Database
Result(s) found: 17421742
Kakatiya Mega Textile Park
03 Nov 2017
Telangana State Industrial Infrastructure Corporation (TSIIC) is settig up Kakatiya Mega Textile Park over a 2,000 acre campus between Shyampet and Chintapalli villages in Warangal district. IL&FS Cluster Development Initiative (IL&FS Clusters) is the Project Consultant....
NGK Spark to set up assembly unit at Bawal
02 Nov 2017
NGK Spark Plugs India plans to set up an additional assembly facility, spread across 11,000 sq mtr at its Bawal plant. The aim is to increase its spark plug capacity and also tap upcoming market demand for oxygen sensors. The work is likely to start soon and complete by 2019....
Urban Water Suppy Scheme Kamalpur
02 Nov 2017
DWS Division, Kamalpur, Dhalai Tripura has invited bids for implementing the Urban Water Suppy Scheme Kamalpur. As part of the scheme, the authority plans to set up 0.72 MGD water treatment plant at Kamalpur....
GHIAL to spend Rs 490 crore for Hyderabad airport expansion
02 Nov 2017
GMR Airports Ltd has raised $350 million (Rs 2,276 crore) in the international bond market. The group subsidiary, GMR Hyderabad International Airport Ltd(GHIAL) will utilise $75 million (close to Rs 490 crore) on capital expenditure for the Hyderabad airport expansion. The regulatory approvals for the proposed airport expansion plan is pending so far....
Water treatment plant at Vadodara
02 Nov 2017
Public Health Works Division, Vadodara plans to assign the Designing, Constructing, Testing and Commissioning of Intake well cum pump house with approach bridge including all allied works, Water Treatment Plant, including Supply, Installation, Testing and Commissioning SITC of Pumping Machinery, Reinforced Cement Concrete Underground Sumps....
Canal based water supply scheme for Sirsa Town
01 Nov 2017
Public Health Engineering Department (PHED) plans to assign the designing, constructing, testing, commissioning, operation and maintenance for 5 years after defect liability period of 12 months after 3 months successful trial run of canal based water supply scheme for Sirsa Town comprising of RCC Inlet Channel, 2 Nos....
WTP for Chandannagore municipal corporation
01 Nov 2017
Kolkata Metropolitan Development Authority plans to assign the design, construction, commissioning, trial run (3 Months), operation and maintenance for 12 months including supply of chemicals and disinfectant as required for 5 Mgd Capacity Water Treatment Plant with allied works for Chandannagore Municipal Corporation under Amrut scheme. The completion is targeted in 18 months....
212 MLD capacity Water Treatment Plant at Surat
01 Nov 2017
Surat Municipal Corporation plans to undertake design, construction, testing & commissioning of 212 MLD capacity Water Treatment Plant with Zero Liquid Discharge (ZLD) system of 290 MLD on turn-key basis including Operation & Maintenance for 5 years at Kosad, Surat. The project is estimated to cost Rs 84.46 crore. The completion is targeted in 21 months....
PHED to set up 4.50 MLD WTP
01 Nov 2017
Public Health Engineering Department (PHED) plans to assign the design, drawing, construction, testing and commissioning of 4.50 MLD capacity conventional water treatment plant, under improvement of Surajpur & Peri urban villages Water Supply Scheme. Bids were recently invited. The project is estimated to cost Rs 1.37 crore....
Strengthening of Marishda to Suniaghat Road
06 Nov 2017
Public Works Directorate, Government of West Bengal has invited sealed quotations for preparation of detailed project report for proposed strengthening of Marishda to Suniaghat Road (V.R.) from 0.00 km to 14.245 km in the District of Purba Medinipur. Application last date is 7tth November, 2017....
1 2 3 4 5 6 7 8 9 10  Next 

Advertise Here [728 W x 90 H pixels]