Sep 18 2017 | India Opportunities

NTPC to replace Talcher and Singrauli plants

NTPC has decided to replace old power plants located at Talcher and Singrauli. The existing plants with 5x200 MW capacity will be replaced with 2×660 MW at each location by building the new ones in the existing premises. Singrauli and Talcher would be commissioned by 2020 and 2021 respectively.

Advertise Here [728 W x 90 H pixels]