Nov 05, 2019 Four laning of NH-363 from Mancherial - Repallewada section National Highways Authority of India has invited bids for the appointment of Safety Consultants for Four laning of NH-363 from Mancherial (Design Km.0.000 / Existing Km.251.900) to Repallewada (Design Km.42.000 / Existing Km.288.510) (Design Length = 42.000 Km) in the State of Telangana under NH (O) on Hybrid Annuity Mode -Package-I.
Apr 18, 2019 Road Link between Bawana - Sonipat National Highways Authority of India plans to undertake the development of Road Link (from Km 0+000 to 29+600) between Bawana Industrial Area, Delhi (from Km 7+750 of UER 2) till bypass of NH-352A at Village Barwasani, Sonipat in Haryana as spur of Urban Extension Road -2 (NH 344 M.) under Hybrid Annuity Method.
Feb 01, 2019 Padra (Kim) - Vadodara Hybrid Annuity project VK-1 Expressway Private Ltd, a wholly-owned subsidiary of IRB has received an appointed date from NHAI for 23.740 Kms long Padra (Kim) - Vadodara Hybrid Annuity project, which is part of the upcoming Vadodara - Mumbai Expressway. VEPL was entrusted to construct an eight lane 23.74 Km section of Expressway between Vadodara and Kim in Gujarat on a Hybrid Annuity Mode (HAM) basis.
Jun 08, 2018 Independent Engineer for Six laning of new NH-248A National Highways Authority of India has invited bids for Independent Engineer services for six laning & strengthening of new NH-248A from existing km 11+682 to km 24+400 (design ch. 9+282 to km 22+000) under NHDP Phase –IV on Hybrid Annuity Mode in the State of Haryana.
Jun 08, 2018 Four Laning of Rampur - Kathgodam section National Highways Authority of India (NHAI) has called for the Appointment of Safety Consultant for Four Laning of Rampur - Kathgodam section of NH-87 from Km.0.000 (Km.190.000 of NH-24) to Km.42.791 (Design Chainage Km.43.446) [Package-I] in the State of Uttar Pradesh under NHDP Phase-III on Hybrid Annuity Mode.
Apr 20, 2018 Four laning of NH 80 section of Mirza Chauki to Farakka National Highways Authority of India has invited four laning of NH 80 section of Mirza Chauki to Farakka from km 215.00 to km 260.00 in the state of Jharkhand (Package-I) on Hybrid Annuity Mode.
Mar 30, 2018 NHAI awards contract to Ashoka Concessions Ltd for Rs 892 crore The National Highways Authority of India (NHAI) has issued Letter of Award (LOA) for four-laning of Belgaum–Khanapur Section of about 30 kilometre to Ashoka Concessions Ltd on Hybrid Annuity Mode at a cost of Rs. 892.16 crore.
Dec 12, 2017 Strengthening of NH-248A in Gurugram National Highways Authority of India has invited tenders upto 18/12/2017 for Six laning & Strengthening of NH-248A from existing km 2.740 (Rajiv Chowk) to km 11.682 in Gurugram under NHDP Phase-IV in the State of Haryana on Hybrid Annuity Mode. The estimated cost of the project is Rs 695.58 crore.
Nov 25, 2017 Four Laning of Dangiywas to Jajiwal road project National Highways Authority of India plans to undertake Four Laning of Dangiywas (km 96.595 of NH-112) to Jajiwal (km 283.500 of NH 65 Nagaur road) section-Package-I (Design length 74.619 km) of Jodhpur Ring Road (In principally declared NH) in the State of Rajasthan under NHDP Phase VII on design, build, operate and transfer Annuity or Hybrid Annuity basis.