Jan 20, 2023 MMRCL to launch first phase of Metro-3 corridor in 2023 The Mumbai Metro Rail Corporation (MMRCL) will roll out the first phase of Aarey-Bandra Kurla Complex (BKC) line of the Colaba-Bandra-SEEPZ Metro-3 corridor in 2023. The MMRCL said it received all eight coaches of the metro train, manufactured in the Alstom Plant in Sri City of Andhra Pradesh.
May 01, 2016 Tunnel Ventilation And A/C Contract The Mumbai Metro Rail Corporation (MMRC) had earlier invited bids for construction of tunnel ventilation and station air-conditioning as part of 33.5-km long Colaba-Bandra-Seepz Metro-3 corridor project.
May 01, 2016 Escalators And Elavators Bids For Metro-3 Corridor The Mumbai Metro Rail Corporation (MMRC) has invited bids for the construction of escalators and elevators inside the 26 planned underground metro stations of 33.5-km long Colaba-Bandra-Seepz Metro-3 corridor.