Aug 01, 2013 7 MW capacity windmill in Maharashtra Plans to install 7 MW capacity windmill in Maharashtra. The trust has invited bids from private parties to set it up and connect up with the grid. Feasibility studies have already been done and the minimum capacity of a wind mill has been prescribed at 800 KW. The project is expected to be awarded by November and should be operational by April next year.
Jul 01, 2013 Ropeway system at Dungeshwari hill Plans installation of ropeway system at Dungeshwari hill, bodhgaya and Mundeshwari hill, Kaimur,Brahmayoni hill, gaya and Barabar cave, Jahanabad. The work is likely to start in 2-3 months
Jul 01, 2013 Patna Metro railway project The state government has signed an MoU with Rites Ltd for feasibility study and detailed project report preparation for the proposed 30-km Patna Metro railway project. The scope of work includes
Apr 15, 2013 Second desalination plant at Pattipulam Plans to construct second desalination plant at Pattipulam. Aecom India Pvt Ltd along with GHD Pty Ltd, Australia, and Watek Engineering Corporation, USA, are appointed to prepare feasibility report in this regard.
Apr 01, 2013 Liquefied Natural Gas (LNG) power plant at Brahmapuram Plans to build 1050 MW Liquefied Natural Gas (LNG) power plant at Brahmapuram. Detailed Feasibility Report (DFR)
Apr 01, 2013 Railway over bridges under Sambalpur Plans to construct railway over bridges under Sambalpur and Balasore division on BOT basis.
Apr 01, 2013 Pinjal water supply project The corporation will undertake Pinjal water supply project for Mumbai city. The city will receive 865 million litres daily (mld) once the project is completed. The work on the feasibility study, environment impact study has started.
Feb 15, 2013 Government of Tamil Nadu as per Vision 2023 The Government of Tamil Nadu as per Vision 2023 document intends to construct a new airport at Sriperumbudur near Chennai. The feasibility report on the proposed greenfield airport is ready. Formal proposal to the Aviation ministry is expected from the State Govt.
Jan 15, 2013 Agra to Lucknow expressway project Plans to construct greenfield six lane access controlled Agra to Lucknow expressway project. The committee selected a consortium of Feedback Infrastructure Services and Redecon as the project development consultant. The consortium would undertake preparation of techno-economic feasibility report (TEFR) and detailed project report (DPR) of the expressway.