To ease out vehicle congestion at the Chennai airport during peak hours, the airport has devised a new traffic plan and has constructed a centre ramp that is likely to be opened in two months. The vehicles going to the domestic terminal will enter through the centre ramp and exit left while those heading to the international terminal will enter from the right and exit from the ramp. The toll booths and other related infrastructure have to be installed for this to become operational. *Image used is for illustration only